Falcon Boys School, Richmond
Key services: Air conditioning
The client
Falcon Prep was an independent boys school in Richmond.
The brief
We were asked by PP Projects to supply a newly built classroom with fresh air and modify the extract system.
Our solution
A new Helios fan was installed in the loft area above the classroom to supply fresh air from a new hole made in the roof by builders.
The extraction supply was then modified to supply a new classroom and toilet area.
The results
All works were carried out in time for the children’s return to school and enjoy the new classroom.
Get in touch for school air conditioning installations
Contact us to enquire about our air conditioning services. We aim to get back to you as soon as possible and can provide free quotations for our work.